Sign In | Join Free | My portofva.com |
|
Brand Name : LONGWELL
Model Number : Oil Drilling Mud Pump
Certification : API-7K
Place of Origin : China
MOQ : 1 PCS
Packaging Details : Plywood case/Iron pallet
Payment Terms : T/T 30%DP, balabce before ship
Supply Ability : 1000 PCS per Month
Forthputting : drill rig
Service Life : 5000-8000 hours
Rated Pressure : 7500Psi
Process : Forging
Weight : 25,000 lbs
Power : 1600 Horsepower
Temperature : UP TO 80 DEG
Test Report : Provide
Industry : Oilfield Drilling
Maximum Flow Rate : 1600 GPM
BOMCO : F800/1000/1300/1600/1600HL
HONGHUA : 3NB-800/1000/1300/1600F
HRSB : RS-F800/1000/1300/1600
INGZHOU : QF-1300/1600
LS-NOW : 3NB1300C/1600
NOV : 12-P-160 14-P-220
WeatherFord : MP-10/16
GD : PZ-7/8/9/10/11
EMSCO : FB-1300/1600
RUSSIAN : UNBT-950/1180L UNB-600 8T650
The discharge manifold is connected with 3 cylinder blocks simultaneously too. It has two ports at left and right side. The drilling fluid can be discharged from left side or right side.
The discharge filter shall be installed at the other side of discharge manifold. The discharging mud go to the drilling fluid line (manifold) after filtering.
Before the mud discharge manifold needs to be repaired, the bypass valve on pressure release line should be opened first, and let the pressure in discharge manifold to be released to zero.
Then install suction manifold and discharge manifold. After adjusting and aligning each part well, use a torque wrench to tighten the connection bolts between suction manifold, discharge manifold and cylinder blocks respectively to specified torque.
(1) Wash the contacting face between discharge manifold and cylinder blocks well, install the seal ring and put it onto cylinder blocks. The tightening torque of bolt M39×3 is 1954~2255N.m.
(2)As per discharge manifold requirement, install the accessory manifold (5-way or 4-way), discharge pulsation dampener, relief valve, bypass valve, and pressure release line etc. The tightening torques of bolts and nuts are required to meet clause 12.2.1.
The suction manifold is connected to 3 cylinder blocks simultaneously. It has three ports at left , middle and right. The drilling fluid can be sucked in from left, right or middle port according to your desire.
(1) Install the suction manifold: clean the flange end face of suction manifold,install seal rings and connect it to three cylinder block. The tightening torque of bolt M39×3 is 321~370N.m
(2) Install suction the suction desurger:install the suction desurger onto the suction manifold.
![]() |
Forging Mud Pump Manifold AH130101052200 AH36001-05.32A.00 BOMCO Images |